Ansa Doors have handed over this station, comprising 4 bifold doors and 1 double sliding automated gate. All doors are integrated into the Ambulance Victoria control systems and have failsafe rapid release systems for emergency egress.
Ansa Doors have successfully tendered to supply and install 17 steel rollers shutters for a warehouse development by Abbe Corrugated Paper in Maffra Street, Coolaroo.
Abbe are a family run business and will be moving from their current Campbellfield location to the new facility once completed.
Ansa Doors have successfully tendered to supply and install 6 large industrial double swing doors for the Yarra Trams Depot in Southbank. The builder on the project is Leighton Contractors Pty Ltd and the Project Managers are Hyder Consulting.
The Southbank Tram Depot is subject to a state funded $24 million upgrade in a venture that will create more than 50 jobs and will help prepare the network for the arrival of 50 new low-floor trams. The tram facility can house all current trams as well as the proposed low floor trams. Melbourne’s tram network is the world’s largest, with about 182 million passenger trips now made on trams each year.
To achieve the requirements of the Tender Ansa worked closely with Leighton and Yarra Trams. The door design posed unique challenges in that the door areas have exceptionally tight side clearances as well as electrified overhead lines preventing more tradition solutions such as roller shutters or bifolding doors. There are also tram tracks at the base preventing any base driven systems. A design utilising hydraulic ram style openers on custom brackets and rebated mounts allows the setup to work effectively. To further complicate matters there are pedestrian access doors in several of the panels. The design issues were worked through with all parties in the Yarra Trams Site Meeting Room and the prompt response from Ansa Doors’ engineers sealed the deal. Completion is expected in September.
Ansa Doors have successfully tendered to supply and install 18 steel rollers shutters for a warehouse development by Westrock Pty Ltd, in 88 Merrindale Road, Croydon South
This is a multi-faceted site custom built by Westrock to suit client demands. Ansa Doors worked closely with Westrock to ensure the best product was slected for the application.
In partnership with builder Vaughan Constructions, Ansa Doors have just completed the final commissioning of 98 roller shutters to the Coles DC in Truganina.
This new distribution centre measures 80,000sqm – four times the size of the MCG! The construction includes more than 1500 tonnes of steel and 20,000 cubic metres of concrete. When operational it will handle more than 1.5 million cartons of product a week. Coles has invested more than $80 million in the new distribution centre.
Ansa Doors continue their support for Ambulance Victoria, with 8 new bifolds and 2 new automated gates being installed into two new stations in Bendigo / Strathdale. Once operational, the two new stations will allow the decommissioning of the existing ambulance station at the Bendigo Hospital, and therefore enable the future $450m Bendigo Hospital redevelopment to begin. The builder is Hansen Yuncken.
Bendigo CBD is progressing well with two bifolds installed and the balance to be completed shortly. Both stations will have bifolds installed and glazed by end of May.
Ansa Doors continue their strong specialty doors success, with both Wilkore and Cojo Constructions to have High Speed Traffic Doors installed by Ansa Doors.
File Image
Wilkore’s purpose built factory in Dalmore Street Scoresby will be fitted with two High Speed Doors to suit specific client requirements.
Cojo’s development off Jayco Drive in Dandenong South is a large (approximately 30 m²) curtain High Speed Door, again purpose built for their client.
Ansa Doors continue to expand into the Tasmanian market, our latest success is with Apple Constructions where we will be supplying fifteen (15) steel roller shutters to the Channel Court Shopping Centre Development in Kingston. This is a $45M project staged over four stages. Stage 3 in currently in construction and comprises specialty shops along Church Street and offices totalling 4,700 square metres.